ClearSky OMEGA
Rev. LIVE — this drawing updates itself

The drawing set that runs the project.

One record from the first look at a parcel to the day it is funded — screen it, design it, price it, then sell it, finance it, or apply for financing against it. Not an app. A learning energy ecosystem.

Open the sheet index
10 yrsof performance history training the platform
8,760hours modelled on every dispatch
1 recordshared by all four businesses
SITE BOUNDARY — 41.2 AC PV ARRAY 4.4 MWdc BESS 2.0 MW · 8 MWh INVERTER / PCS METER GRID COMPUTE 1.2 MW critical
ProjectIllustrative record
SheetE-101 One-line
Dispatching3.4 MW
RevisionLIVE
Who OMEGA is for
SHEET G-002

Four businesses, one project record

Everyone who touches an energy project is working from a different file. OMEGA is the one they can all open — and each of them gets the part of it that does their job.

Know the ceiling before you buy the dirt.

Interconnection headroom read against the real feeder, an hour-by-hour dispatch across all 8,760, and a pro forma that reconciles to it rather than to a peak-shaving estimate. Then apply for financing without rebuilding a single number.

Explore the platform
Maple Ridge BESSPROJECT RECORD
Feeder headroom4.2 MW available
8,760 dispatch612 cycles modelled
Pro formaReconciled to dispatch
Financing packageReady to submit

Your product, specified before the RFQ exists.

When a developer places your SKU in a design, the bill of materials writes itself and the opportunity reaches you sized, sited and already engineered around your equipment. You quote your own lines — and the buyer stays anonymous until they accept.

See how demand routes
Opportunity 4471VENDOR VIEW
Your lines3 of 11 in the BOM
Sized against4.2 MW feeder limit
Buyer identityHeld until accepted
Quote windowOpen

Drawings and quantities off one model.

The one-line, the plot plan and the take-off all read the same project, so moving a compartment re-routes the trench, re-counts the schedule and carries through to the estimate. Separations are checked live against NFPA 855 and IFC 1207 as you draw.

See the drawing set
Sheet set E-101 → C-400ISSUE STATUS
Trench4,120 ft measured
SeparationsNFPA 855 · IFC 1207 clear
Take-offAACE Class 4
DrawingsRe-issued on change

Size it and quote it on site.

Pull the interval data, size the system and hand over a proposal in your own branding before you leave the parking lot. It runs in whatever browser you have with you — nothing to install, nothing to sync when you get back to the office.

See white-label
Site visit — 6 minFIELD SESSION
Interval dataImported
Recommended2 × 215 kWh
Demand saving$41,800 / yr
ProposalSent, your branding
End to end
SHEET G-005

Pre-screening to funded, on one record

Each step reads what the step before it produced. Nothing is re-keyed, re-drawn or re-modelled — which is the only reason the numbers still agree by the time a lender sees them.

01

Pre-screen

Rank a parcel on grid position before anyone options the dirt — voltage, distance to the point of interconnection, circuits and buildable acreage.

02

Design and size

Lay the site out against what the utility can actually deliver, with the bill of materials writing itself as equipment lands.

03

Price

Quantities measured off the drawing, and a pro forma that reconciles to an hour-by-hour dispatch rather than to a peak.

04

Sell or source

Route the bill of materials to vendors for quotes, place compute capacity, or put the project itself in front of buyers.

05

Finance

File once with the evidence attached — or apply for financing straight from the project, against the numbers already on the record.

06

Operate

Enroll the asset across the value stack and keep earning on it once it is built.

Compute
SHEET C-701

Where firm power is worth more than the land.

Data-centre developers are not shopping for acreage — they are shopping for interconnection. OMEGA lays out a compute campus against what the grid will actually carry, sizes the generation and storage that closes the gap, and tells you whether the site can hold the load before anyone signs anything.

Built from our own campus work. In limited trial — ask us for access.

Campus screenILLUSTRATIVE
Load asked for180 MW
Utility will carry122 MW
Gap58 MW
Closed on siteGeneration + storage
AnswerBefore site control
BasisReal feeder
StatusTRIAL
Sheet index
SHEET G-001

One platform, six ways it goes to work

Every capability shares the same data, the same project context and the same intelligence — so work done in one place makes every other part smarter.

10 yrsof partner performance history training the platform
Real-timeoptimization across dispatch, pricing and the value stack
1 platformfrom site lead to operating asset
AI-drivena living ecosystem that learns with every project
PERMIT READY

See a living drawing set on a real site.

Book a walkthrough and we'll show you OMEGA running from parcel to permit to operating asset — and the moment the one-line starts dispatching for real.